
We've welded in both floor panels. After completely cutting out the left side and cleaning all the mounting areas, we fitted the new panel to the tub. We trimmed one side of the panel to appropriately fit the gearbox tunnel. Then we drilled a series of holes in the floor panel for rosette (plug) welds, which simulate the factory spot …