Sorry all, didn't see the porn links.
SVreX, good luck in your next carreer.
Funny, I got an email from a coworker earlier today with the same pics, minus the free porn advertisements and such of course.
Some rather interesting links on that page.
Watcha been surfin, 914?
Might wanna mention it's NSFW. My boss was just checkin over my shoulder.
Well, in his defense, that gas line is supposed to be buried deep enough a posthole digger couldn't get down to it.
I like calling Ms Utility. They say there's no lines on my place, so I go rip them up.
foxtrapper wrote: Well, in his defense, that gas line is supposed to be buried deep enough a posthole digger couldn't get down to it.
Ours is only ~2ft down...
The 42" REX pipeline currently being installed through southern Ohio only gets 36" of cover.
Article on REX thru Kansas - http://www.krwa.net/lifeline/currentissue/0711_050.pdf
A typical right-of-way is 75 feet for temporary workspace and 50 feet for permanent right-of-way. The pipe will have 3 feet of cover. A 42-inch-diameter high-strength steel is being used for the pipeline.
Article about the part going thru Ohio - http://www.kindermorgan.com/business/gas_pipelines/rockies_express/RE_Northeast_Project.pdf
You'll need to log in to post.