Finally got the engine and trans mounted and on the carrier. In order to do this and blow off some steam after fighting to get the two connected sideways. I pulled the engine off the cradle and turned it on its nose, next I picked up the trans and got it to fit in an upright position. All this took about 15 minutes. The kicker was fighting with it the other way for 4 hours.