I thought I’d take a diversion from all the welding grinding, and sanding and stripped the R/F running gear. Cleaned and stripped all components, rebuilt the calipers, installed new pads, and 1” lower, 430” uprated springs, removed the backing plate, repacked the bearings and a installed new steering rack boot. One more to go……